SALINE, MICH.- The Saline Lift Station Reconstruction included the renovation of 4 different pump stations and 5 panel upgrades around the City of Saline. The Shmina team encountered challenges such as long lead times for material as a cause of the pandemic along with having to dig over 25 feet in saturated soil to place a wet well!